JKSCE
KSCE JOURNAL OF CIVIL AND
ENVIRONMENTAL ENGINEERING RESEARCH
KSCE
Contact
ISSN : 1015-6348 (Print)
ISSN : 2799-9629 (Online)
Mobile QR Code
Journal of the Korean Society of Civil Engineers
ISO Journal Title
KSCE J. Civ. Environ. Eng. Res.
Open Access, Bi-monthly
Main Menu
Main Menu
최근호
Current Issue
논문집
Journal Archive
저널소개
About Journal
편집위원회
Editorial Board
논문투고안내
For Authors and Reviewers
윤리규정
Publication Ethics
Principles of Transparency and Best Practice
Business Model
연락처
Contact Info
논문투고
E-submission
Journal Search
Home
All Issues
2023-02
(v.43 n.1)
10.12652/Ksce.2023.43.1.0109
Journal XML
XML
PDF
INFO
REF
References
1
Al-Bahar, J. F. (1989). Risk management in construction projects: a systemic analytical approach for contractors, Ph.D. Dissertation, University of California Berkeley, Berkeley, California, USA.
2
Choi, J. W. (2015). An analysis on regional differences of major delay factors in overseas architectural projects, Master. Dissertation, Hanyang University, Seoul, Korea (in Korean).
3
Devlin, J., Chang, M. W., Lee, K. and Toutanova, K. (2019). “BERT: Pre-training of deep bidirectional transformers for language understanding.” arXiv:1810.04805v2, pp. 1-16.
4
Ha, S. G., Kim, T. H., Son, K. Y., Kim, J. M. and Son, S. H. (2018). “Quantification model development of human accidents on external construction site by applying probabilistic method.” Journal of the Korea Institute of Building Construction, Vol. 18, No. 6, pp. 611-619 (in Korean).
5
Kang, H. B. and Yi, J. S. (2018). “An analysis of public text data in construction disaster cases using Word2Vec-based data visualization.” Autumn Annual Conference of AIK, 2018, Architectural Institute of Korea, Vol. 38, No. 2, pp. 567-570 (in Korean).
6
Kang, L. S., Kim, C. H. and Kwak, J. M. (2002). “Analysis for the importance of risk factors through the project life cycle.” Journal of the Architectural Institute of Korea Structure & Construction, Vol. 17, No. 8, pp. 103-110 (in Korean).
7
Kim, J. S. (2022). Analysis of project delay using big data, Master. Dissertation, Hanyang University, Seoul, Korea (in Korean).
8
Kim, J. S. and Kim, B. S. (2019). “Characteristics analysis of seasonal construction site fall accident using text mining.” Korean Journal of Construction Engineering and Management, Vol. 20, No. 3, pp. 113-121 (in Korean).
9
Lee, C. H., Lee, Y. J. and Lee, D. H. (2020). “A study of fine tuning pre-trained korean BERT for question answering performance development.” Journal of Information Technology Services, Vol. 19, No. 5, pp. 83-91.
10
Lee, H. C., Lee, J. H. and Go, S. S. (2009). “A study on the priority analysis of work delay factors in steal-frame work using FMEA.” Construction Engineering and Management, Vol. 10, No. 1, pp. 91-101 (in Korean).
11
Lee, H. K. (2018). A risk assessment model for delay management protocol in the contract conditions of international construction projects, Ph.D. Dissertation, Ajou University, Suwon, Korea (in Korean).
12
Lee, J. H. and Yi, J. S. (2017). “Predicting project’s uncertainty risk in the bidding process by integrating unstructured text data and structured numerical data using text mining.” Applied Sciences, Vol. 7, No. 11, pp. 1-15.
13
Marzouk, M. and Enaba, M. (2019). “Text analytics to analyze and monitor construction project contract and correspondence.” Automation in Construction, Vol. 98, pp. 265-274.
14
Park, G. S. (2012). A study on the estimation of an appropriate construction duration of apartment, Master. Dissertation, Seoul National University of Science and Technology, Seoul, Korea (in Korean).
15
Park, J. H., Choi, H. S., Cho, Y., Bang, K. S., Yun, S. H. and Paek, J. H. (2010). “A study on the development of probabilistic duration estimation module using monte carlo simulation.” Journal of the Architectural Institute of Korea Structure & Construction, Vol. 26, No. 5, pp. 101-108 (in Korean).
16
Park, K. C. and Kim, H. K. (2021). “Analysis of seasonal importance of construction hazards using text mining.” KSCE Journal of Civil and Environmental Engineering Research, KSCE, Vol. 41, No. 3, pp. 305-316 (in Korean).
17
Project Management Institute (PMI) (2021). A guide to the project management body of knowledge (PMBOK Guide), Project Management Institute, Newton Square, PA.
18
Shin, H. J., Sung, K. M. and Heo, J. H. (2010). “Derivation of modified anderson-darling test statistics and power test for the gumbel distribution.” Journal of Korea Water Resources Association, KWRA, Vol. 43, No. 9, pp. 813-822 (in Korean).
19
Son, B. Y. and Lee, E. B. (2019). “Using text mining to estimate schedule delay risk of 13 oshore oil and gas EPC case studies during the bidding process.” Energies, Vol. 12, No. 10, pp. 1-25.
20
Vaswani, A., Shazeer, N., Parmar, N., Uszkoreit, J., Jones, L., Gomez, A. N., Kaiser, L. and Polosukhin, I. (2017). “Attention is all you need.” arXiv:1706.03762v5, pp. 1-15.
21
Wang, G., Liu, M., Cao, D. and Tan, D. (2020). “Identifying high- frequency-low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai.” Engineering, Construction and Architectural Management, Vol. 29, No. 2, pp. 940-960.
22
Yang, H. S. (2020). Comparison of recognition on the risks affecting schedule delays and cost overruns in overseas civil construction projects, Master. Dissertation, Hanyang University, Seoul, Korea (in Korean).
23
Yoon, J. K. (2017). A study to derive delay factors based on international standard contract at building construction in the south-east Asia, Master. Dissertation, University of Seoul, Seoul, Korea (in Korean).
24
Yoon, J. S. (2020). Development of method for quantifying and applying non-working day to planning and scheduling to calculate normal project duration, Ph.D. Dissertation, Ajou University, Suwon, Korea (in Korean).
25
Yoon, Y. S., Suh, S. W., Park, M. S. and Jang, M. H. (2008). “Construction process based schedule risk management system.” Construction Engineering and Management, Vol. 9, No. 4, pp. 101-110 (in Korean).
26
Yu, Y. J., Son, K. Y., Kim, T. H. and Kim, J. M. (2017). “A basic study on cost prediction model based on repair and replacement causes by using probabilistic forecasting concept - focused on educational facilities.” Architecture & City in JEJU, Architectural Institute of Korea, Vol. 37, No. 1, pp. 887-890 (in Korean).