Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
BIM Forum, 2016 LOD Specification (2016), AIA.BIM Forum, 2016 LOD Specification (2016), AIA.Google Search
2 
Cho, H. T., Kwon, S. H. and Han, J. G. (2017). “Estimation of environmental load of geotechnical structure using multiple regression analysis.” KSCE Journal of Civil Engineering, Vol. 21, No. 5, pp. 1581-1586.10.1007/s12205-017-0419-yCho, H. T., Kwon, S. H. and Han, J. G. (2017). “Estimation of environmental load of geotechnical structure using multiple regression analysis.” KSCE Journal of Civil Engineering, Vol. 21, No. 5, pp. 1581-1586.DOI
3 
ISO 14040 (1997). Environmental Management - Life Cycle Assess-ment - Principles and Framework.ISO 14040 (1997). Environmental Management - Life Cycle Assess-ment - Principles and Framework.Google Search
4 
ISO 14040 Series (2004). Life Cycle Assessment : Best Practices of ISO 14040 Series), APEC.ISO 14040 Series (2004). Life Cycle Assessment : Best Practices of ISO 14040 Series), APEC.Google Search
5 
ISO 14041 (1998). Environmental Management - Life Cycle Assess-ment Goal and Scope Definition and Inventory Analysis.ISO 14041 (1998). Environmental Management - Life Cycle Assess-ment Goal and Scope Definition and Inventory Analysis.Google Search
6 
ISO 14042 (2000). Environmental Management - Life Cycle Assess-ment - Life Cycle impact Assessment.ISO 14042 (2000). Environmental Management - Life Cycle Assess-ment - Life Cycle impact Assessment.Google Search
7 
ISO 14043 (2000). Environmental Management - Life Cycle Assess-ment - Life Cycle Interpretation.ISO 14043 (2000). Environmental Management - Life Cycle Assess-ment - Life Cycle Interpretation.Google Search
8 
ISO 14049 (2000). Illustrative Examples on how to Apply ISO 14041 - Life Cycle Assessment - Goal and Scope Definition and Inventory Analysis.ISO 14049 (2000). Illustrative Examples on how to Apply ISO 14041 - Life Cycle Assessment - Goal and Scope Definition and Inventory Analysis.Google Search
9 
Kim, S. A. Yoon, S. W., Chin, S. Y. and Kim, T. Y (2009). “Develop-ment of Automated Modeling System for Apartment Interior to Improve Productivity of BIM- based Quantity Take-Off.” Journal of the Architectural Institute of Korea Structure & Construction, Vol. 25, No. 9, pp. 133-143 (in Korean).Kim, S. A. Yoon, S. W., Chin, S. Y. and Kim, T. Y (2009). “Develop-ment of Automated Modeling System for Apartment Interior to Improve Productivity of BIM- based Quantity Take-Off.” Journal of the Architectural Institute of Korea Structure & Construction, Vol. 25, No. 9, pp. 133-143 (in Korean).Google Search
10 
Kwon, S. H. (2008). Development of assessment model for envi-ronmental economics of construction projects. Ph.D. Thesis, Chung-Ang University.Kwon, S. H. (2008). Development of assessment model for envi-ronmental economics of construction projects. Ph.D. Thesis, Chung-Ang University.Google Search
11 
Kwon, S. H., Kim, S. G., Jeong, W. J. and Kim, S. B. (2006). “The life cycle assessment of infrastructure considering environmental load.” Korea Institute of Construction Engineering and Management, Proceedings of the KICEM Annual Conference.Kwon, S. H., Kim, S. G., Jeong, W. J. and Kim, S. B. (2006). “The life cycle assessment of infrastructure considering environmental load.” Korea Institute of Construction Engineering and Management, Proceedings of the KICEM Annual Conference.Google Search
12 
Lawrence, M., Pottinger, R., Satub-French, S. and Nepal, M. P. (2014). “Creating flexible mappings between building information models and cost information.” Automation in Construction, Vol. 45, pp. 107-118.10.1016/j.autcon.2014.05.006Lawrence, M., Pottinger, R., Satub-French, S. and Nepal, M. P. (2014). “Creating flexible mappings between building information models and cost information.” Automation in Construction, Vol. 45, pp. 107-118.DOI
13 
Lee, C. H., Kim, S. A. and Chin, S. Y. (2011) “An index for mea-su-ring the degree of completeness of BIM-based quantity take-off.” Joural of Korea Institute of Construction Engineering and Mana-gement, Vol. 12, No. 6, pp. 80-92 (in Korean).Lee, C. H., Kim, S. A. and Chin, S. Y. (2011) “An index for mea-su-ring the degree of completeness of BIM-based quantity take-off.” Joural of Korea Institute of Construction Engineering and Mana-gement, Vol. 12, No. 6, pp. 80-92 (in Korean).Google Search
14 
Lee, H. C., Kim, J. M., Choi, C. H. and Song, S. H. (2017). “BIM- based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city -.” Joural of KIBIM, Vol. 7, No. 3, pp. 11-20 (in Korean).Lee, H. C., Kim, J. M., Choi, C. H. and Song, S. H. (2017). “BIM- based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city -.” Joural of KIBIM, Vol. 7, No. 3, pp. 11-20 (in Korean).Google Search
15 
Ministry of Environment, Available at: http://www.me.go.kr/.Ministry of Environment, Available at: http://www.me.go.kr/.Google Search
16 
Ministry of Land, Transport and Maritime Affairs (2011). Guideline for the estimation of carbon emission from each facilityMinistry of Land, Transport and Maritime Affairs (2011). Guideline for the estimation of carbon emission from each facilityGoogle Search
17 
Ministry of Trade, Industry and Energy, Available at: http://www. motie.go.kr.Ministry of Trade, Industry and Energy, Available at: http://www. motie.go.kr.Google Search