Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers

References

1 
"An, N., Li, X., Yang, H., Pang, X., Gao, G. and Ding, D. (2024). “From building information modeling to building energy modeling: Optimization study for efficient transformation.” Buildings, Vol. 14, No. 8, 2444, pp. 2-22."DOI
2 
"Doukari, O., Seck, B. and Greenwood, D. (2022). “The creation of construction schedules in 4D BIM: A comparison of conventional and automated approaches.” Buildings, Vol. 12, No. 8, 1145, pp. 2-33."DOI
3 
"Doukari, O., Seck, B. and Greenwood, D. (2022). “The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France.” Frontiers in Built Environment, Vol. 8, 998309, pp. 1-18."DOI
4 
"Jeong, J. W., Seo, J. H., Park, Hy, J. and Choo, S. Y. (2019). “A study on implementation of 4D and 5D support algorithm using BIM attribute information - Focused on process simulation and quantity calculation -.” Journal of the Regional Association of Architectural Institute of Korea, Vol. 21, No. 4, pp. 15-26."URL
5 
"Kim, B. Y. (2024). “Development of plant BIM library according to object geometry and attribute information guidelines.” Journal of the Korean Institute of Landscape Architecture, Vol. 52, No. 2, pp. 51-63, https://doi.org/10.9715/KILA.2024.52.2.051."DOI
6 
"Kim, H., Anderson, K., Lee, S. and Hildreth, J. (2013). “Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology”. Automation in Construction, Vol. 35, pp. 285-295."DOI
7 
"Kim, W. T. and Lee, H. Y. (2024). “Prediction of oxygen extraction fraction based on LSTM deep learning model using brain MRI.” The Journal of Korean Institute of Information Technology, Korean Institute of Information Technology, Vol. 22, No. 6, pp. 143-151 (in Korean)."URL
8 
"Kim, W., Park, J., Cha, Y., Hyun, C. and Han, S. (2019). “Development of model requirements checklist for utilizing BIM in construction phase - Focused on the MEP.” Korean Journal of Construction Engineering and Management, Vol. 20, No. 1, pp. 22-31, https://doi.org/10.6106/KJCEM.2019.20.1.022 (in Korean)."DOI
9 
"Li, X., Xu, J. and Zhang, Q. (2017). “Research on construction schedule management based on BIM technology.” Procedia engineering, Vol. 174, pp. 657-667."DOI
10 
"Park, S. H., Song, J. H. and Oh, K. S. (2015). “A study on the information for the schedule management of the construction based BIM.” Journal of the Society for Digital Content, Vol. 16, No. 4, pp. 555-564, https://doi.org/10.9728/dcs.2015.16.4.555 (in Korean)."DOI
11 
"Park, S. H., Song, J. H. and Oh, K. S. (2018). “Development of Construction Schedule Management System based on BIM.” Journal of the Architectural Institute of Korea Structure & Construction, AIK, Vol. 34, No. 3, pp. 61-68 (in Korean)."DOI
12 
"Şenol, H. İ. and Gökgöz, T. (2024). “Integration of Building Information modeling (BIM) and Geographic Information System (GIS): a new approach for IFC to CityJSON conversion.” Earth Science Informatics, pp. 1-18."DOI
13 
"Song, J. Y. and Lee, J. K. (2018). “Implementation of BIM-based automated layout system for ceiling light object using spatial object and its properties.” Proc. of Conf, Korean Institute of Interior Design, Korean Institute of Interior Design, Vol. 20, No. 2, pp. 37-40 (in Korean)."URL
14 
"Song, S. Y., Yang, J. S. and Myeong, T. S. (2012). “Automated generation of a construction schedule based on the work method template for 4D simulation.” IE Interfaces, KIIE, Vol. 25, No. 2, pp. 216-228 (in Korean)."DOI
15 
"Yoon, H. S. (2022). A study on the automatic generation method of construction activity information for schedule management using BIM design information, Master's Thesis, GyeongSang National University."URL