Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers

References

1 
Iglesias V., Richard A. (2019). "Descriptive analysis of construction scheduling data towards automation of 4D building information modeling", M.S Thesis, University of Illinois at Urbana- Champaign, USA.Google Search
2 
Jeong J. W., Seo J. H., Park H. J., Choo S. Y. (2019). "A study on implementation of 4D and 5D support algorithm using BIM attribute information - Focused on process simulation and quantity calculation -.", Journal of the Regional Association of Architectural Institute of Korea, The Regional Association of Architectural Institute of Korea, Vol. 21, No. 4, pp. 15-26Google Search
3 
Lee J. C. (2004). "Developing an automated module for scheduling and quantity estimation based on 3D CAD model information towards effective use of 4D CAD model.", Journal of the Architectural Institute of Korea Structure & Construction, Architectural Institute of Korea, Vol. 20, No. 2, pp. 15-22Google Search
4 
Melzner J., Hanff J. (2016). "Automatic generation of 4D- schedules for reliable construction management.", Lake Constance 5D-Conference 2016, Constance.Google Search
5 
Song J. W. (2016). "A study on development of construction BIM template for process management of construction projects & measures for information utilization", Thesis of Master Degree, Nam Seoul UniversityGoogle Search
6 
Song S. Y., Yang J. S., Myeon T. S. (2012). "Automated generation of a construction schedule based on the work method template for 4D simulation.", Industrial Engineers Interfaces, Korean Institute Of Industrial Engineers, Vol. 25, No. 2, pp. 216-228DOI
7 
Vries B., Harink J. M. J. (2007). "Generation of a construction planning from a 3D CAD model.", Journal of Automation in Construction, Vol. 16, No. 1, pp. 13-18DOI
8 
Wilfredo T. C., Chi Y., Amer F., Mani G. F. (2019). "Automated mining of construction schedules for easy and quick assembly of 4D BIM simulations.", ASCE International Conference on Computing in Civil Engineering, Atlanta, United States, pp. 432-438DOI
9 
Yoo J. S. (2010). "A study of 4D simulation system through automatic scheduling process", Thesis of Master Degree, Konkuk UniversityGoogle Search