Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Cha, M. J., Lee, G. W., Kim, J. Y., Park, J. W. and Cho, M. Y. (2011). "A 3D surface modeling system for intelligent excavation system." Automation in Construction, Vol. 20, pp. 808-817.DOI
2 
Cho, J. Y. (2017). Strategies and Implication of Japanese Construction Industry in the 4th Industrial Revolution, Constriction Policy Review Report 2017-03, Korea Research Institute for Construction Policy (in Korean).
3 
Cho, Y. L. (2015). "Introduction to the intelligent excavating system." Journal of Drive and Control, Vol. 12, No. 3, pp. 61-65 (in Korean).
4 
Fujita Research (2017). Unmanned Construction (Tech. Brochure), Fujita Research, Encino, CA. USA, Available at: http://www.fujitaresearch. com/fujita-unmanned.pdf (Accessed: December 30, 2017).
5 
Korea Aerospace Research Institute (KARI) (2017). "The 4th Industrial Revolution and Drones." Korea Air Research Institute Aviation Issue, No. 13 (in Korean).
6 
Kim, S. K. and Lim, S. Y. (2017). "A study on the improvement of a fleet management system for construction equipment." Journal of the Korean Society of Civil Engineers, Vol. 37, No. 6, pp. 1063-1076 (in Korean).
7 
Kim, S. K. and Min, S. G. (2012). "Development of a work information model and a work path simulator for an intelligent excavation." Journal of the Korean Society of Civil Engineers, Vol. 32, No. 3D, pp. 259-267 (in Korean).
8 
Kim, S. K. and Russell, J. S. (2003). "Framework for an intelligent earthwork system: Part I. System architecture." Automation in Construction, Vol. 12, No. 1, pp. 1-13.DOI
9 
Kim, S. K., Lee, J. B. and Kim, Y. S. (2004). "A study on core technologies and technological innovation strategies for construction automation." Journal of the Korean Society of Civil Engineers, Vol. 24, No. 5D, pp. 795-803 (in Korean).
10 
Kim, S. K., Russell, J. S. and Koo, K. J. (2003). "Construction robot path-planning for earthwork operations." ASCE Journal of Computing in Civil Engineering, Vol. 17, No. 2, pp. 97-104.DOI
11 
Kim, S. K., Seo, J. W. and Russell, J. S. (2012). "Intelligent navigation strategies for an automated earthwork system." Automation in Construction, Vol. 21, pp. 132-147.DOI
12 
Kim, Y. S., Kim, H. C., Seo, J. H. and Oh, S. W. (2001). "A study for the introduction of construction automation and robotics technologies in domestic construction industry." Journal of Architectural Institute of Korea, Vol. 17, No. 2, pp. 111-120 (in Korean).
13 
Korea Institute of Construction Technology (KICT) (1998). A study on the development of semi-automatic equipment of construction machinery (VII), KICT Research Report (98-084) (in Korean).
14 
Lee, H. S. and Yang, H. M. (2017). "Innovative methods for construction technology at the Era of 4th industrial revolution." Journal of the Korea Institute of Building Construction, Vol. 17, No. 2, pp. 12-17 (in Korean).
15 
Mawdesley, M. J., A‐Jibouri, S. H., Askew, W. H. and Patterson, D. E. (2002). "A model for the automated generation of earthwork planning activities." Construction Innovation, Vol. 2, No. 4, pp. 249-268.DOI
16 
National Archives of Singapore (2017). 2nd Construction Productivity Roadmap, Media Factsheet, Available at: http://www.nas.gov.sg/ archivesonline/data/pdfdoc/20170307002/.
17 
Oh, J., Oh, J. S. and Jung, H. Y. (2014). "Applicability to the construction of 3D printing technology." The Magazine of the Korean Society of Civil Engineers, Vol. 62, No. 9, pp. 38-44 (in Korean).
18 
Oloufa, A. A., Ikeda, M. and Oda, H. (2003). "Situational awareness of construction equipment using GPS, wireless and web technologies." Automation in Construction, Vol. 12, pp. 737-748.DOI
19 
Park, T. S. and Park, H. S. (2018). "The current status and facilitation strategy of BIM for civil infrastructure projects." Journal of the Korean Society of Civil Engineers, Vol. 38, No. 1, pp. 133-140 (in Korean).
20 
Paulson, B. C. (1985). "Automation and robotics for construction." Journal of Construction Engineering and Management, Vol. 111, No. 3, pp. 190-207.DOI
21 
Seo, J. W. (2017). R&D Report: Fleet management for construction equipment and Smart construction technology using ICT, Korea Agency for Infrastructure Technology Advancement (in Korean).
22 
Seward, D. and Zied, K. (2003). "Towards a comprehensive feasibility analysis for the use of robots in the construction industry." Proceedings of the 20th International Symposium on Automation and Robotics in Construction, Eindhoven, Holland, pp. 399-405.DOI
23 
Siebert, S. and Teizer, J. (2014). "Mobile 3D mapping for surveying earthwork projects using an unmanned aerial vehicle (UAV) system." Automation in Construction, Vol. 41 , pp. 1-14.DOI
24 
Smart Construction Tech Research Group (2018). Integrated Fleet Management and Smart Construction Technology in the 4th Industrial Revolution, YouTube KR Movie Clip, Available at: https://www. youtube.com/watch?v=frPgTe59YVc (Accessed: August 10, 2018).
25 
Sokkia Korea (2013). Positioning Instruments Catalog 2013, Available at: https://www.sokkia.co.kr/default/1004web/dd/d08.php (in Korean).
26 
Son, T. H. (2016) "From constructing the team to construction 2025." The CERIK Quarterly Report-Summer, CERIK, pp. 49-52 (in Korean).
27 
Taylor, M., Wamuziri, S. and Smith, I. (2003). "Automated construction in Japan." Proc. of the Institution of Civil Engineers - Civil Engineering, Vol. 156, No. 1, pp. 34-41.DOI
28 
Torres-Rodriguez, H. I., Parra-Vega, V. and Ruiz-Sanchez, F. J. (2005). "A haptic excavator system with active masses sliding mode PD force-force position control." 16th Triennial World Congress, IFAC Publications, Prague, Czech Republic, pp. 517-522.DOI
29 
Trimble (2018). Earthworks Grade Control Platform, Available at: https://construction.trimble.com/earthworks (in Korean).
30 
White, D. J., Vennapusa, P. and Gieselman, H. (2010). "Iowa's intelligent compaction research and implementation." Research, Iowa Department of Transportation, pp. 1-11.
31 
Yoshihiro, K. (2003). "A remotely controlled robot operates construction machines." Industrial Robot: An International Journal, Vol. 30, No. 5, pp. 422-425.