JKSCE
KSCE JOURNAL OF CIVIL AND
ENVIRONMENTAL ENGINEERING RESEARCH
KSCE
Contact
ISSN : 1015-6348 (Print)
ISSN : 2799-9629 (Online)
Mobile QR Code
Journal of the Korean Society of Civil Engineers
ISO Journal Title
KSCE J. Civ. Environ. Eng. Res.
Open Access, Bi-monthly
Main Menu
Main Menu
최근호
Current Issue
논문집
Journal Archive
저널소개
About Journal
편집위원회
Editorial Board
논문투고안내
For Authors and Reviewers
윤리규정
Publication Ethics
Principles of Transparency and Best Practice
Business Model
연락처
Contact Info
논문투고
E-submission
Journal Search
Home
All Issues
2018-08
(v.38 n.4)
10.12652/Ksce.2018.38.4.0601
Journal XML
XML
PDF
INFO
REF
1
Agrama, F. A. E.-M. (2011). “Linear projects scheduling using spreadsheets features.” Alexandria Engineering Journal, Vol. 50, No. 2. pp. 179-185.
2
Biruk, S. and Jaskowski, P. (2017). “Scheduling linear construction projects with constraints on resource availability.” Archives of Civil Engineering, Vol. 63, No. 1, pp. 3-15.
3
Go, H. J. (2011). “A study on improvement method of construction schedule management techniques by linear scheduling model.” Master Thesis, Hongik University (in Korean).
4
Kim, W. J. (2012). “Effectiveness of linear scheduling methods in nuclear power plant construction.” Master Thesis, Myongji University (in Korean).
5
Lee, G. S. and Park, H. S. (2011). “Implementation of time management; based on road construction projects.” Journal of the Korean Society of Civil Engineers, KSCE, Vol. 31, No. 3. pp. 451-456 (in Korean).
6
Liu, L., Liu, Y. and Tang, Y. (2016). “Production rate determination for linear construction projects based on linear scheduling method.” International Journal of Smart Home, Vol. 10, No. 4, pp. 143-152.
7
Tilos, Available at: https://www.tilos.org (accessed Dec. 2016).