Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Korea Expressway Corporation (EX) (2010), Construction Post Evaluation of Cheongwon-Sangju Expressway and Another 1 Line (in Korean).
2 
Korea Expressway Corporation (EX) (2010), Construction Post Evaluation of Iksan-Pohang Expressway (Daegu~Pohang) and Another 1 Line (in Korean).
3 
Kwon, S. W. and Park, H. S. (2009). “The case study of post evaluation for apartment complex projects.” Journal of Architectural Institute of Korea, Architectural Institute of Korea, Vol. 25, No. 7, pp. 121- 128.
4 
Lee, D. H. and Park, J. W. (2013). “Improvement scheme of utilization of the results of the post-construction evaluation system.” Korea Journal of Construction Engineering and Management, KICEM, Vol. 14, No. 6, pp. 78-89. 10.6106/KJCEM.2013.14.6.078DOI
5 
Lee, D. H., K, Kwon, S. W. and Park, H. S. (2007). “Reformation proposal of post evaluation regulation for public construction projects.” Journal of the Architectural Institute of Korea, Architectural Institute of Korea, Vol. 23, No. 3, pp. 113-120.
6 
Ministry of Land, Infrastructure and Transport (2013). Improvement for Comprehensive Analysis and Reflux Systems of Construction Post Evaluation, 11-1613000-000157-01 (in Korean).
7 
Seo, C. B. (2015). Improving Practical Use of the post-evaluation : Focused on Expressway. Master's Degree Dissertation. University of Seoul.