Title Effective Analysis Framework for Construction Post Evaluation
Authors 김태영(Kim, Tae Yeong) ; 박희성(Park, Hee-Sung)
DOI https://doi.org/10.12652/Ksce.2016.36.6.1145
Page pp.1145-1152
ISSN 10156348
Keywords 사후평가;성과;건설;벤치마킹 Post evaluation;Performance;Construction;Benchmarking
Abstract A construction post evaluation is introduced to provide information that can be used for similar construction projects in the future through the evaluation of the efficiency of a public construction project and the verification of the appropriateness of the project results. However, it is not widely used due to a lack of awareness of the method. For this reason, the aim of this study is to provide a basic frame that can be utilized as a reference for a similar project in the future based on the construction post evaluation. More specifically, a more effective analysis method for the construction post evaluation is proposed and then an exemplary analysis is performed based on the method. The paper analyzes 293 cases stored in construction CALS. Construction cost growth rates of railway projects are tend to be greater than other project types like highway, expressway, and harbour. Then, construction schedule grwoth rates of expressway are greater than others. This is expected to provide useful information for a future project, and serve as a basic frame. Moreover, it is also meaningful that a project can be analyzed from different perspectives through the construction post evaluation.