Lee, D. H. and Park, J. W. (2013). “Improvement scheme of utilization of the results
of the post-construction evaluation system.” Korean Journal of Construction Engineering
and Management, KICEM, Vol. 14, No. 6, pp. 78-89 (in Korean).10.6106/kjcem.2013.14.6.078Lee,
D. H. and Park, J. W. (2013). “Improvement scheme of utilization of the results of
the post-construction evaluation system.” Korean Journal of Construction Engineering
and Management, KICEM, Vol. 14, No. 6, pp. 78-89 (in Korean).
