Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Akinci, B., Fischer, M. and Kunz, J. (2002). “Automated generation of work space required by construction acitivies.” Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 4, pp. 306-315.10.1061/(ASCE)0733-9364(2002)128:4(306)Akinci, B., Fischer, M. and Kunz, J. (2002). “Automated generation of work space required by construction acitivies.” Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 4, pp. 306-315.DOI
2 
An, S. H., Kim, J. H. and Kang, K. I. (2006). “A study on the measures for work interference reduction in apartment construction.” Journal of The Korean Institute of Building Construction, Vol. 6, No. 1, pp. 117-122.10.5345/JKIC.2006.6.1.117An, S. H., Kim, J. H. and Kang, K. I. (2006). “A study on the measures for work interference reduction in apartment construction.” Journal of The Korean Institute of Building Construction, Vol. 6, No. 1, pp. 117-122.DOI
3 
Chavada, R., Dawood, N. and Kassem, M. (2012). “Construction workspace management: The Development and Application of a Novel nD Planning Approach and Tool.” Journal of Information Technology in Construction, Vol. 17, pp. 213-236.Chavada, R., Dawood, N. and Kassem, M. (2012). “Construction workspace management: The Development and Application of a Novel nD Planning Approach and Tool.” Journal of Information Technology in Construction, Vol. 17, pp. 213-236.Google Search
4 
Choi, B. J., Lee, H. S., Park, M. S., Kim, H. S. and Hwang, S. J. (2013). “4D BIM based workspace planning process in building construction project.” Korean Journal of Construction Engineering and Management, Vol. 14, No. 5, pp. 175-187.10.6106/KJCEM.2013.14.5.175Choi, B. J., Lee, H. S., Park, M. S., Kim, H. S. and Hwang, S. J. (2013). “4D BIM based workspace planning process in building construction project.” Korean Journal of Construction Engineering and Management, Vol. 14, No. 5, pp. 175-187.DOI
5 
Chua, D., Yeoh, K. and Song, Y. (2010). “Quantification of spatial temporal congestion in Four-dimensional computer-aided design.” Journal of Construction Engineering and Management, ASCE, Vol. 130, pp. 598-606.10.1061/(ASCE)CO.1943-7862.0000166Chua, D., Yeoh, K. and Song, Y. (2010). “Quantification of spatial temporal congestion in Four-dimensional computer-aided design.” Journal of Construction Engineering and Management, ASCE, Vol. 130, pp. 598-606.DOI
6 
Guo, S. J. (2002). “Identification and resolution of workspace conflicts in building construction.” Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 4, pp. 287-295.10.1061/(ASCE)0733-9364(2002)128:4(287)Guo, S. J. (2002). “Identification and resolution of workspace conflicts in building construction.” Journal of Construction Engineering and Management, ASCE, Vol. 128, No. 4, pp. 287-295.DOI
7 
Hammad, A., Zhang, C., Mohamed, A. H. and Cardianl, G. (2007). “Equipment workspace analysis in infrastructure projects.” Canadian Journal of Civil Engineering, Vol. 34, No. 10, pp. 1247-1256.10.1139/l07-048Hammad, A., Zhang, C., Mohamed, A. H. and Cardianl, G. (2007). “Equipment workspace analysis in infrastructure projects.” Canadian Journal of Civil Engineering, Vol. 34, No. 10, pp. 1247-1256.DOI
8 
I-Chen, W. and Yen-Chang, C. (2010). “4D workspace conflict detection and analysis system.” Proceedings of 10th International Conference on Construction Applications of Virtual Reality, Japan. I-Chen, W. and Yen-Chang, C. (2010). “4D workspace conflict detection and analysis system.” Proceedings of 10th International Conference on Construction Applications of Virtual Reality, Japan.Google Search
9 
Jang, S. J., Jeon, H. J., Shim, T. B., Eom, S. J., Yun, S. H. and Paek, J. H. (2008). “A study on the tower-crane equipment planning support system in the BIM environment.” Journal of Korean Society of Civil Engineers, Vol. 24, No. 7, pp. 109-116. Jang, S. J., Jeon, H. J., Shim, T. B., Eom, S. J., Yun, S. H. and Paek, J. H. (2008). “A study on the tower-crane equipment planning support system in the BIM environment.” Journal of Korean Society of Civil Engineers, Vol. 24, No. 7, pp. 109-116.Google Search
10 
Kamat, V. and Martinez, J. (2005). “Dynamic 3D visualization of articulated construction equipment.” Journal of Computing in Civil Engineering, ASCE, Vol. 19, No. 4, pp. 356-368.10.1061/(ASCE)0887-3801(2005)19:4(356)Kamat, V. and Martinez, J. (2005). “Dynamic 3D visualization of articulated construction equipment.” Journal of Computing in Civil Engineering, ASCE, Vol. 19, No. 4, pp. 356-368.DOI
11 
Kang, L. S., Moon, H. S., Kim, H. S. and Kwak, J. M. (2013). “Usability improvement of BIM for construction projects using active BIM functions.” Korean Journal of Construction Engineering and Management, Vol. 14, No. 5, pp. 74-83.10.6106/KJCEM.2013.14.5.074Kang, L. S., Moon, H. S., Kim, H. S. and Kwak, J. M. (2013). “Usability improvement of BIM for construction projects using active BIM functions.” Korean Journal of Construction Engineering and Management, Vol. 14, No. 5, pp. 74-83.DOI
12 
Kim, H. S., Cho, B. N., Yun, S. Y., Kim, Y. H., Moon, H. S. and Kang, L. S. (2014). “A study on 3D modling and optimization of workspace considering work type in construction projects.” Proceedings of KIBIM Annual Conference 2014, KIBIM, KOFST, Vol. 4, No. 1, pp. 25-26Kim, H. S., Cho, B. N., Yun, S. Y., Kim, Y. H., Moon, H. S. and Kang, L. S. (2014). “A study on 3D modling and optimization of workspace considering work type in construction projects.” Proceedings of KIBIM Annual Conference 2014, KIBIM, KOFST, Vol. 4, No. 1, pp. 25-26Google Search
13 
Mallasi, Z. (2006). “Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation.” Automation in Construction, Vol. 15, No. 5, pp. 640-655.10.1016/j.autcon.2005.08.005Mallasi, Z. (2006). “Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation.” Automation in Construction, Vol. 15, No. 5, pp. 640-655.DOI
14 
Moon, H. S., Dawood, N. and Kang, L. S. (2014). “Development of workspace conflict visualization system using 4D object of work schedule.” Advanced Engineering Informatics 28, pp. 50-65. 10.1016/j.aei.2013.12.001Moon, H. S., Dawood, N. and Kang, L. S. (2014). “Development of workspace conflict visualization system using 4D object of work schedule.” Advanced Engineering Informatics 28, pp. 50-65.DOI
15 
Moon, H. S., Kang, L. S. and Dawood, N. (2010). “Development of a workspace conflict verification model for temporary facilities based on a VR simulation.” Proceedings of The International Conference on Computing in Civil and Building Engineering, University of Nottingham, UK.Moon, H. S., Kang, L. S. and Dawood, N. (2010). “Development of a workspace conflict verification model for temporary facilities based on a VR simulation.” Proceedings of The International Conference on Computing in Civil and Building Engineering, University of Nottingham, UK.Google Search
16 
Moon, H. S., Kim, H. S., Kang, L. S. and Kim, B. S. (2013). “A simulation model for deciding an optimized 3D shape of construction workspace considering resources in BIM environment.” Proceedings of 15th International Conference on Construction Engineering and Project Management (ICCEPM-2013)Moon, H. S., Kim, H. S., Kang, L. S. and Kim, B. S. (2013). “A simulation model for deciding an optimized 3D shape of construction workspace considering resources in BIM environment.” Proceedings of 15th International Conference on Construction Engineering and Project Management (ICCEPM-2013)Google Search
17 
Riley. D. and Sanvido. V. (1997). “Space planning method for multi-story building construction.” Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 2, pp. 171-180.10.1061/(ASCE)0733-9364(1997)123:2(171)Riley. D. and Sanvido. V. (1997). “Space planning method for multi-story building construction.” Journal of Construction Engineering and Management, ASCE, Vol. 123, No. 2, pp. 171-180.DOI
18 
Seo, J. H. (2012). A collaborative process of BIM-based clash detection for the constructability review, Master Thesis, Hanyang University.Seo, J. H. (2012). A collaborative process of BIM-based clash detection for the constructability review, Master Thesis, Hanyang University.Google Search
19 
Song, D. H., Lee, S. B. and Song, H. S. (2011). “A study on the secure method of construction workspace by using building information modeling.” Proceeding of the KIC, Vol. 11, No. 2, pp. 9-10.Song, D. H., Lee, S. B. and Song, H. S. (2011). “A study on the secure method of construction workspace by using building information modeling.” Proceeding of the KIC, Vol. 11, No. 2, pp. 9-10.Google Search
20 
Tantisevi, K. and Akinci, B. (2007). “Automated generation of workspace requirements of mobile crane operations to support conflict detection.” Automation in Construction, Vol. 16, No. 3, pp. 262-276.10.1016/j.autcon.2006.05.007Tantisevi, K. and Akinci, B. (2007). “Automated generation of workspace requirements of mobile crane operations to support conflict detection.” Automation in Construction, Vol. 16, No. 3, pp. 262-276.DOI
21 
Yeo, E. S. (2002). Efficient real-time collision detection method using sampling tree, Master Thesis, Sungkyunkwan University.Yeo, E. S. (2002). Efficient real-time collision detection method using sampling tree, Master Thesis, Sungkyunkwan University.Google Search