Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Cho, H. N., Kim, J.-H., Choi, Y-M. and Lee, K. M. (2003). “Practical application of life-cycle cost effective design and rehabilitation of civil infrastructures.” Proceedings of JSSC03.Cho, H. N., Kim, J.-H., Choi, Y-M. and Lee, K. M. (2003). “Practical application of life-cycle cost effective design and rehabilitation of civil infrastructures.” Proceedings of JSSC03.Google Search
2 
Hawk, H. (2002). Bridge Life Cycle Cost Analysis - Final Report, NCHRP Project 12-43, National cooperative highway research program, Transportation Research Board, National Research Council.Hawk, H. (2002). Bridge Life Cycle Cost Analysis - Final Report, NCHRP Project 12-43, National cooperative highway research program, Transportation Research Board, National Research Council.Google Search
3 
Kong, J. S. and Frangopol, D. M. (2003). “Life-cycle reliability- based maintenance cost optimization of deteriorating structures with emphasis on bridges.” Journal of Structural Engineering, Vol. 129, No. 6, 818-828.10.1061/(ASCE)0733-9445(2003)129:6(818)Kong, J. S. and Frangopol, D. M. (2003). “Life-cycle reliability- based maintenance cost optimization of deteriorating structures with emphasis on bridges.” Journal of Structural Engineering, Vol. 129, No. 6, 818-828.DOI
4 
Korea Expressway Corporation (2003). Research of life cycle cost analysis for the highway bridge, Korea Expressway Corporation (in Korean).Korea Expressway Corporation (2003). Research of life cycle cost analysis for the highway bridge, Korea Expressway Corporation (in Korean).Google Search
5 
Korea Infrastructure Safety Corporation (2003). Safety inspection and precision safety diagnosis detailed guideline, Ministry of Land, Infrastructure and Transport (in Korean).Korea Infrastructure Safety Corporation (2003). Safety inspection and precision safety diagnosis detailed guideline, Ministry of Land, Infrastructure and Transport (in Korean).Google Search
6 
Liu, M. and Frangopol, D. M. (2005). “Multiobjective maintenance planning optimization for deteriorating bridges considering condition, safety, and life-cycle cost.” Journal of Structural Engineering, ASCE, Vol. 131, No. 5, pp. 833-842.10.1061/(ASCE)0733-9445(2005)131:5(833)Liu, M. and Frangopol, D. M. (2005). “Multiobjective maintenance planning optimization for deteriorating bridges considering condition, safety, and life-cycle cost.” Journal of Structural Engineering, ASCE, Vol. 131, No. 5, pp. 833-842.DOI
7 
Park, K. H., Lee, S. Y., Yoon, J. H., Cho, H. N. and Kong, J. S. (2008). “Optimum maintenance scenario generation for existing steel-girder bridges based on lifetime performance and cost.” Smart Structures and Systems, Vol. 4, No. 5, pp. 641-65310.12989/sss.2008.4.5.641Park, K. H., Lee, S. Y., Yoon, J. H., Cho, H. N. and Kong, J. S. (2008). “Optimum maintenance scenario generation for existing steel-girder bridges based on lifetime performance and cost.” Smart Structures and Systems, Vol. 4, No. 5, pp. 641-653DOI
8 
Yoon, J. H. and Cho, H. N. (2007). “Reliability-based assessment of structural safety of steel-concrete hybrid cable-stayed bridge erected by the FCM and FSM during construction.” Journal of Korean Society of Steel construction, Vol. 19, No. 5, pp. 515-526 (in Korean).Yoon, J. H. and Cho, H. N. (2007). “Reliability-based assessment of structural safety of steel-concrete hybrid cable-stayed bridge erected by the FCM and FSM during construction.” Journal of Korean Society of Steel construction, Vol. 19, No. 5, pp. 515-526 (in Korean).Google Search