Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers

References

1 
Al-Bahar, J. F. (1989). Risk management in construction projects: A systemic analytical approach for contractors, Ph.D. Dissertation, University of California Berkeley, Berkeley, California, USA.URL
2 
Choi, J. W. (2015). An analysis on regional differences of major delay factors in overseas architectural projects, Master Dissertation, Hanyang University, Seoul, Korea (in Korean).URL
3 
kakao (2020). Kakao hangul analyzer Ⅲ, Available at: https://github.com/kakao/khaiii (Accessed: October 18, 2022).URL
4 
Kang, H. B. and Yi, J. S. (2018). “An analysis of public text data in construction disaster cases using Word2Vec-based data visualization.” Autumn Annual Conference of AIK, 2018, Architectural Institute of Korea, Vol. 38, No. 2, pp. 567-570 (in Korean).URL
5 
Kang, L. S., Kim, C. H. and Kwak, J. M. (2002). “Analysis for the importance of risk factors through the project life cycle.” Journal of the Architectural Institute of Korea Structure & Construction, Vol. 17, No. 8, pp. 103-110 (in Korean).URL
6 
Kim, J. S. (2022a). Analysis of project delay using big data, Master Dissertation, Hanyang University, Seoul, Korea (in Korean).URL
7 
Kim, E. H. (2022b). Automatic classification on the work breakdown structure of apartment construction projects: A machine learning approach, Master Dissertation, Sungkyunkwan University, Seoul, Korea (in Korean).URL
8 
Kim, J. S. and Kim, B. S. (2019). “Characteristics analysis of seasonal construction site fall accident using text mining.” Korean Journal of Construction Engineering and Management, Vol. 20, No. 3, pp. 113-121 (in Korean).DOI
9 
Kim, K. H., Kim, K. H., Lee, Y. S. and Kim, J. J. (2008). “A study about influence of risk factors in relation to construction cost increase and schedule delay on the reinforced concrete construction.” Journal of the Architectural Institute of Korea Structure & Construction, Vol. 24, No. 5, pp. 165-172 (in Korean).URL
10 
Lee, J. H. and Yi, J. S. (2017). “Predicting project’s uncertainty risk in the bidding process by integrating unstructured text data and structured numerical data using text mining.” Applied Sciences, Vol. 7, No. 11, pp. 1-15.DOI
11 
Lee, J. S., Kim, D. Y., Lee, C. J., Lee, J. H. and Han, S. H. (2018). “A research for clustering of conflict in public construction project.” Korean Journal of Construction Engineering and Management, Vol. 19, No. 2, pp. 61-72 (in Korean).DOI
12 
Marzouk, M. and Enaba, M. (2019). “Text analytics to analyze and monitor construction project contract and correspondence.” Automation in Construction, Vol. 98, pp. 265-274.DOI
13 
Mikolov, T., Chen, K., Corrado, G. and Dean, J. (2013). Efficient estimation of word representations in vector space, Available at: https://arxiv.org/abs/1301.3781 (Accessed: October 18, 2022).DOI
14 
Park, E. L. and Cho, S. Z. (2014). “KoNLPy: Koreannatural language processing in Python.” Annual Conference on Human and Language Technology, pp. 133-136 (in Korean).URL
15 
Park, K. C. and Kim, H. K. (2021). “Analysis of seasonal importance of construction hazards using text mining.” Journal of the Korean Society of Civil Engineers, KSCE, Vol. 41, No. 3, pp. 305-316 (in Korean).DOI
16 
Seo, D. H. (2019). Text mining with python, bjpublic, Seoul, Korea (in Korean).URL
17 
Shin, Y. J. and Chi, S. H. (2014). “Tacit knowledge informatization from text-based construction data.” Annual Conference of KICEM, 2014, Korean Journal of Construction Engineering and Management, pp. 31-34 (in Korean).URL
18 
Smilkov, D., Thorat, N., Nicholson, C., Rief, E., Viegas, F. and Wattenberg, M. (2016). Embedding projector: Interactive visualization and interpretation of embeddings, Available at: https://arxiv.org/abs/1611.05469 (Accessed: October 18, 2022).DOI
19 
Son, B. Y. and Lee, E. B. (2019). “Using text mining to estimate schedule delay risk of 13 oshore oil and gas EPC case studies during the bidding process.” Energies, Vol. 12, No. 10, pp. 1-25.DOI
20 
Wang, G., Liu, M., Cao, D. and Tan D. (2020). “Identifying high- frequency-low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai.” Engineering, Construction and Architectural Management, Vol. 29, No. 2, pp. 940-960.DOI
21 
Yang, H. S. (2020). Comparison of recognition on the risks affecting schedule delays and cost overruns in overseas civil construction projects, Master Dissertation, Hanyang University, Seoul, Korea (in Korean).URL
22 
Yang, S. W. and Lim, H. C. (2021). “Semantic network analysis on the research trends of construction accident.” Journal of the Architectural Institute of Korea, Vol. 37, No. 6, pp. 231-236 (in Korean).DOI
23 
Yoon, Y. S., Suh, S. W., Park, M. S. and Jang, M. H. (2008). “Construction process based schedule risk management system.” Construction Engineering and Management, Vol. 9, No. 4, pp. 101-110 (in Korean).URL