Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers

References

1 
Al-Hazim, N. and Abusalem, Z. (2015). “Delay and cost overrun in road construction projects in Jordan.” International Journal of Engineering & Technology, SPC, Vol. 4, No. 2, pp. 288-293, https://doi.org/10.14419/ijet.v4i2.4409.DOI
2 
Ammar, T., Abdel-Monem, M. and El-Dash, K. (2022). “Risk factors causing cost overruns in road networks.” Ain Shams Engineering Journal, Elsevier, Vol. 13, No. 5, 101720, https://doi.org/10.1016/j.asej.2022.101720.DOI
3 
Anigbogu, N. A., Ahmad, Z. B. and Molwus, J. J. (2019). “Cost overruns on federal capital territory authority road construction projects.” FUTY Journal of the Environment, AJOL, Vol. 13, No. 1, pp. 1-14.URL
4 
Choi, J. Y., Yun, S. M. and de Oliveira, D. P. (2016). “Developing a cost normalization framework for phase-based performance assessment of construction projects.” Canadian Journal of Civil Engineering, Canadian Science Publishing, Vol. 43, No. 12, pp. 1075-1086, https://doi.org/10.1139/cjce-2016-0223.DOI
5 
Dolage, D. A. R. and Dasantha, O. M. C. (2022). “Critical factors affecting cost overrun in foreign funded road construction projects in Sri Lanka: A Case Study of Road Development Authority and Provincial Road Development Authorities.” Engineer, The Institution of Engineers, Sri Lanka, Vol. 55, No. 2, pp. 21-30, https://doi.org/10.4038/engineer.v55i2.7505.DOI
6 
Gupta, M. D. (2018). Now, New Concept to Measure Length of Highways From April 1. Available at: https://www.hindustantimes. com/india-news/now-new-concept-to-measure-length-of-highways-from-april-1/story-Q44qGgFzl4DsAPv5OIG0YI.html (Accessed: June 8, 2023).URL
7 
Herrera, R. F., Sánchez, O., Castañeda, K. and Porras, H. (2020). “Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis.” Applied Sciences, MDPI, Vol. 10, No. 16, 5506, https://doi.org/10.3390/app10165506.DOI
8 
Kaliba, C., Muya, M. and Mumba, K. (2009). “Cost escalation and schedule delays in road construction projects in Zambia.” International Journal of Project Management, Elsevier, Vol. 27, No. 5, pp. 522-531, https://doi.org/10.1016/j.ijproman.2008.07.003.DOI
9 
Kim, T. Y. and Park, H. S. (2016). “Effective analysis framework for construction post evaluation.” KSCE Journal of Civil and Environmental Engineering Research, KSCE, Vol. 36, No. 6, pp. 1145-1152, https://doi.org/10.12652/Ksce.2016.36.6.1145 (in Korean).DOI
10 
Korea Institute of Civil Engineering and Building Technology (KICT). (2012). A Study on the Improvement of Post Evaluation Scheme for Construction Projects (in Korean).URL
11 
Korea Institute of Civil Engineering and Building Technology (KICT). (2020). A Trend of Performance Assessment System of Construction Projects (in Korean).URL
12 
Korea Institute of Civil Engineering and Building Technology (KICT). (2022). Construction Cost Indieces (in Korean). Available at: https://cost.kict.re.kr/#/notice/file/detail/34178;page=0;category=index (Accessed: February 2, 2023).DOI
13 
Korea Research Institute for Human Settlements (KRIHS). (2011). Efficient Application of Post Evaluation Scheme for Road Projects (in Korean).URL
14 
Korea Research Institute for Human Settlements (KRIHS). (2013). A Study on the Utilization Guidelines for Post Evaluation of Road Projects (in Korean).URL
15 
Kurniawan, D. and Abd Majid, M. Z. (2022). “Critical risk factor affecting cost overrun in highway project of west sumatera.” Proceedings of IOP Conference Series: Earth and Environmental Science, Vol. 1022, 012013, https://doi.org/10.1088/1755-1315/1022/1/012013.DOI
16 
Midwest Economic Policy Institute (MEPI). (2018). A Comparison of Highway Construction Costs in the Midwest and Nationally.URL
17 
Ministry of Land Infrastructure and Transport (MOLIT). (2022). A manual of road operations (in Korea). Available at: http://www. molit.go.kr/USR/policyData/m_34681/dtl.jsp?search=&srch_ dept_nm=&srch_dept_id=&srch_usr_nm=&srch_usr_titl=Y&srch_usr_ctnt=&search_regdate_s=&search_regdate_e=&psize=10&s_category=&p_category=&lcmspage=1&id=4632 (Accessed: April 17, 2023).URL
18 
Ok, H. and Yang, S. H. (2014). “Development of the construction post-evaluation system in public construction projects.” Journal of the Korea Academia-Industrial Cooperation Society, KAIS, Vol. 15, No. 12, pp. 7364-7371, https://doi.org/10.5762/KAIS.2014.15.12.7364 (in Korean).DOI
19 
Whaley III, D. L. (2005). The interquartile range: Theory and estimation, Msc. Thesis. East Tennessee State University.URL
20 
Yun, S. M., Choi, J. Y., de Oliveira, D. P., Mulva, S. P. and Kang, Y. C. (2016). “Measuring project management inputs throughout capital project delivery.” International Journal of Project Management, Elsevier, Vol. 34, No. 7, pp. 1167-1182, https://doi.org/10.1016/j.ijproman.2016.06.004.DOI