Azar, E. R. and Kamat, V. R. (2017). “Earthmoving equipment automation: A review of
                           technical advances and future outlook.” Journal of Information Technology in Construction
                           (ITcon), Vol. 22, No. 13, pp. 247-265.
                           			
                        
                      
                     
                        
                        Barrett, L. and TIG–AMG, C. A. (2008). “Automated machine guidance: An emerging technology
                           whose time has come?.” In Transportation Research Board Annual Meeting. Washington,
                           DC. January.
                           			
                        
                      
                     
                        
                        Bernold, L. E. (2002). “Spatial integration in construction.” Journal of Construction
                           Engineering and Management, Vol. 128, No. 5, pp. 400-408.
                           			10.1061/(ASCE)0733-9364(2002)128:5(400)

 
                     
                        
                        Bradley, D. A. and Seward, D. W. (1995, December). “Developing real-time autonomous
                           excavation-the LUCIE story.” In Decision and Control, 1995., Proceedings of the 34th
                           IEEE Conference on, Vol. 3, pp. 3028-3033.
                           			10.1109/CDC.1995.478607

 
                     
                        
                        Han, S. W., Lee, S. Y. and Halpin, D. W. (2005). “Productivity evaluation of the conventional
                           and GPS-based earthmoving systems using construction simulation.” In Construction
                           Research Congress 2005, pp. 1-9.
                           			10.1061/40754(183)35

 
                     
                        
                        Huang, X. and Bernold, L. (1997). “CAD-integrated excavation and pipe laying.” Journal
                           of Construction Engineering and Management, Vol. 123, No. 3, pp. 318-323.
                           			10.1061/(ASCE)0733-9364(1997)123:3(318)

 
                     
                        
                        Jonasson, S., Dunston, P. S., Ahmed, K. and Hamilton, J. (2002). “Factors in productivity
                           and unit cost for advanced machine guidance.” Journal of construction engineering
                           and management, Vol. 128, No. 5, pp. 367-374.
                           			10.1061/(ASCE)0733-9364(2002)128:5(367)

 
                     
                        
                        Kim, W. B. (2018). A case study onthe field application of machine guidance. M.S.
                           Dissertation, Hanyang University, Seoul, Republic of Korea.
                           			
                        
                      
                     
                        
                        Korea Institute of Civil Engineering and Building Technology (2017). 2017 Standard
                           Production Unit System.
                           			
                        
                      
                     
                        
                        Lee, B. N., Woo, S. K., Chang, C. K. and Koo, B. S. (2006). “Using next generation
                           technologies to resolve construction labor shortage problems.” Journal of the Korean
                           Society of Civil Engineers D, Vol. 26, No. 6D, pp. 969-974 (in Korean).
                           			
                        
                      
                     
                        
                        Rezazadeh Azar, E., Agnew, G. and Parker, A. (2015a). “Effectiveness of automated
                           machine guidance technology in productivity improvement : case study.” ICSC15, p.
                           269.
                           			
                        
                      
                     
                        
                        Shim, K. B. (2013). A Study on the Construction Labor Policy for Sustainable Job Creation.
                           Planning and Policy, pp. 28-34.
                           			
                        
                      
                     
                        
                        Tserng, H. P., Han, J. Y., Lin, C. T., Skibniewski, M. and Weng, K. W. (2012). “GPS-Based
                           real-time guidance information system for marine pier construction.” Journal of Surveying
                           Engineering, Vol. 139, No. 2, pp. 84-94.
                           			10.1061/(ASCE)SU.1943-5428.0000096

 
                     
                        
                        Vennapusa, P. K., White, D. J. and Jahren, C. T. (2015). “Impacts of automated machine
                           guidance on earthwork operations.” Civil Construction and Environmental Engineering
                           Conference Presentations and Proceedings, 34. http://lib.dr.iastate.edu/ccee_conf/34
                           			
                        
                      
                     
                        
                        Yoon, J. S., Lee, S. S., Park, S. H., Lee, S. M. and Seo, J. W. (2016). “Earthwork
                           test and performance evaluation using machine guidance for excavator.” Proc. of KSCE
                           2016 Conf, pp. 21-22 (in Korean).
                           						
                        
                      
                     
                        
                        Yoshikatsu, M., Kenji, S., Toshifumi, S. and Motohisa, H. (1998). “Development of
                           virtual survey marking system for remote control of construction machinery II.” Proceedings
                           of the 15th ISARC, pp. 519-527.