The Ministry of Construciton and Transportation (2002). Summary on Profit/Loss Analysis
and Recommendation for Overseas Projects, pp. 5-31.
Kim, I. H. (2001). Risk Management for Construction Industry, Kimundang, pp. 58-76.
Korea Commercial Arbitration Board (2010). Explanation on the International Arbitration
Rules.
Han, S. and Kim, D. (2006). “Research on profit anticipation model based on risk analysis
for overseas construction contracts.” collection of learned papers of Korean Society
of Civil Engineers, pp. 635-647
Han, S., Seon, S., Park, S. and Chang, D. (2006). “Research on level of profit effective
elements and application of cases.” collection of learned papers of Korea Institute
of Construction Engineering and Management.
Hyun, H. (2009). Contract Management and Claims for Overseas Construciton Contracts,
Cplus International.
Hyun, H. (2012). Identification of Contractual risk elements based on the FIDIC Red
Book 1999 Edition, Paper for Master degree of Science, Chung Buk University.
Conditions of Contract for Construction (1999). FIDIC.
Conditions of Contract for Design-Build and Operate Project (2008). FIDIC.
Conditions of Contract for EPC/Turnkey Project (1999). FIDIC.
Conditions of Contract for Plant and Design-Build (1999). FIDIC.
Ellis Baker, Ben Mellors, Scott Chalmers, Anthony Lavers FIDIC CONTRACTS : Law and
Practice (2009). Informa.
Nael, G. B. (2005). The FIDIC Forms of Contract, 3rd Edition, Blackwell Publishing
Ltd.
Royal Institution of Chartered Surveyors (2010). COBRA 2010 Report, Royal Institution
of Chartered Surveyors, London, UK, pp. 8-11.
The FIDIC Contracts Guide (2000). FIDIC.
Walewski, J. and Gibson, E. (2003). “Development of the international project risk
assessment (IPRA).” Construction Industry Institute (CII), Austin, TX, p. 1.
Zhi, H. (1995). “Risk management for overseas construction projects.” International
Journal of Project Management, IPMA, Vol. 13, No. 4, pp. 231-237.
10.1016/0263-7863(95)00015-I