Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Easa, S. M. (1988). “Improved method for locating centroid of earthwork.” Journal of Surveying Engineering, ASCE, Vol. 114, No. 1, pp. 13-25.10.1061/(ASCE)0733-9453(1988)114:1(13)Easa, S. M. (1988). “Improved method for locating centroid of earthwork.” Journal of Surveying Engineering, ASCE, Vol. 114, No. 1, pp. 13-25.DOI
2 
Easa, S. M. (1992). “Estimating earchwork volumes of curved roadways: Mathematical Model.” Journal of Transportation Engineering, ASCE, Vol. 118, No. 6, pp. 834-849.10.1061/(ASCE)0733-947X(1992)118:6(834)Easa, S. M. (1992). “Estimating earchwork volumes of curved roadways: Mathematical Model.” Journal of Transportation Engineering, ASCE, Vol. 118, No. 6, pp. 834-849.DOI
3 
Easa, S. M. (1993). “Smooth boundary approximation for directly computing irregular area.” Journal of Surveying Engineering, ASCE, Vol. 119, No. 3, pp. 86-101.10.1061/(ASCE)0733-9453(1993)119:3(86)Easa, S. M. (1993). “Smooth boundary approximation for directly computing irregular area.” Journal of Surveying Engineering, ASCE, Vol. 119, No. 3, pp. 86-101.DOI
4 
Easa, S. M. (1998). “Smooth surface approximation for computing pit excavation volume.” Journal of Surveying Engineering, ASCE, Vol. 124, No. 3, pp. 125-133.10.1061/(ASCE)0733-9453(1998)124:3(125)Easa, S. M. (1998). “Smooth surface approximation for computing pit excavation volume.” Journal of Surveying Engineering, ASCE, Vol. 124, No. 3, pp. 125-133.DOI
5 
Epps, J. W. and Corey, M. W. (1990). “Cut and fill calculation by modified average-end-area method.” Journal of Transportation Engineering, ASCE, Vol. 116, No. 5, pp. 683-689.10.1061/(ASCE)0733-947X(1990)116:5(683)Epps, J. W. and Corey, M. W. (1990). “Cut and fill calculation by modified average-end-area method.” Journal of Transportation Engineering, ASCE, Vol. 116, No. 5, pp. 683-689.DOI
6 
Ji, Y., Borrmann, A. and Rank, E. (2010). “Mathematical modeling of earthwork optimization problems.” Proceedings of the fifth International Conference on Computing in Civil and Building Engineering 2010 (ICCCBE 2010).Ji, Y., Borrmann, A. and Rank, E. (2010). “Mathematical modeling of earthwork optimization problems.” Proceedings of the fifth International Conference on Computing in Civil and Building Engineering 2010 (ICCCBE 2010).Google Search
7 
Kim, S. K. and Russell, J. S. (2003a). “Framework for an intelligent earthwork system: Part I. System Architecture.” Automation in Construction, Vol. 12, No. 1, pp. 1-13.10.1016/S0926-5805(02)00034-1Kim, S. K. and Russell, J. S. (2003a). “Framework for an intelligent earthwork system: Part I. System Architecture.” Automation in Construction, Vol. 12, No. 1, pp. 1-13.DOI
8 
Kim, S. K. and Russell, J. S. (2003b). “Framework for an intelligent earthwork system: Part II. Task Identification/Scheduling and Resource Allocation Methodology.” Automation in Construction, Vol. 12, No. 1, pp. 15-27.10.1016/S0926-5805(02)00033-XKim, S. K. and Russell, J. S. (2003b). “Framework for an intelligent earthwork system: Part II. Task Identification/Scheduling and Resource Allocation Methodology.” Automation in Construction, Vol. 12, No. 1, pp. 15-27.DOI
9 
Lee, C. K., Kim, S. K. and Sung, Y. J. (2003). “A study on 2D-based earthwork planning methods.” Journal of the Korean Society of Civil Engineers, Vol. 23, No. 3D, pp. 349-357.Lee, C. K., Kim, S. K. and Sung, Y. J. (2003). “A study on 2D-based earthwork planning methods.” Journal of the Korean Society of Civil Engineers, Vol. 23, No. 3D, pp. 349-357.Google Search
10 
Marzouk, M. and Moselhi, O. (2004). “Fuzzy clustering model for estimating haulers' travel time.” Journal of Construction Engineering and Management, ASCE, Vol. 130 No. 6, pp. 878-886.10.1061/(ASCE)0733-9364(2004)130:6(878)Marzouk, M. and Moselhi, O. (2004). “Fuzzy clustering model for estimating haulers' travel time.” Journal of Construction Engineering and Management, ASCE, Vol. 130 No. 6, pp. 878-886.DOI
11 
Moselhi, O. and Alshibani, A. (2009). “Optimization of earthmoving operations in heavy civil engineering projects.” Journal of Construction Engineering and Management, ASCE, Vol. 135, No. 10, pp. 948-954. 10.1061/(ASCE)0733-9364(2009)135:10(948)Moselhi, O. and Alshibani, A. (2009). “Optimization of earthmoving operations in heavy civil engineering projects.” Journal of Construction Engineering and Management, ASCE, Vol. 135, No. 10, pp. 948-954.DOI
12 
Ricca, F. and Simeone, B. (2008). “Local search algorithm for political districting.” European Journal of Operational Research, ELSEVIER, Vol. 189, No. 3, pp. 1409-1426.10.1016/j.ejor.2006.08.065Ricca, F. and Simeone, B. (2008). “Local search algorithm for political districting.” European Journal of Operational Research, ELSEVIER, Vol. 189, No. 3, pp. 1409-1426.DOI
13 
Smith, S. (1999). “Earthmoving productivity estimation using linear regression techniques.” Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 3, pp. 131-141.10.1061/(ASCE)0733-9364(1999)125:3(133)Smith, S. (1999). “Earthmoving productivity estimation using linear regression techniques.” Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 3, pp. 131-141.DOI
14 
Son, J. H., Mattila, K. G. and Myers, D. S. (2005). “Determination of haul distance and direction in mass excavation.” Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 3, pp. 302-309.10.1061/(ASCE)0733-9364(2005)131:3(302)Son, J. H., Mattila, K. G. and Myers, D. S. (2005). “Determination of haul distance and direction in mass excavation.” Journal of Construction Engineering and Management, ASCE, Vol. 131, No. 3, pp. 302-309.DOI
15 
Tam, C. M., Tong, T. L. and Wong, B. L. (2007). “An integrated system for earthmoving planning.” Journal of  Construction Management and Economics, ASCE, Vol. 25, pp. 1125-1135.10.1080/01446190701468836Tam, C. M., Tong, T. L. and Wong, B. L. (2007). “An integrated system for earthmoving planning.” Journal of  Construction Management and Economics, ASCE, Vol. 25, pp. 1125-1135.DOI
16 
U.S. Department of Commerce (2002). Construction review, U.S. Department of Commerce.U.S. Department of Commerce (2002). Construction review, U.S. Department of Commerce.Google Search
17 
Zhang, H. (2008). “Multi-objectives simulation-optimization for earthworkmoving operations.” Automation in Construction, Vol. 18, No. 1, pp. 78-86.10.1016/j.autcon.2008.05.002Zhang, H. (2008). “Multi-objectives simulation-optimization for earthworkmoving operations.” Automation in Construction, Vol. 18, No. 1, pp. 78-86.DOI