Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
1 
Abdel Aziz, A. M. and Russell, A. D. (2006). “Generalized economic modeling for infrastructure and capital investment projects.” Journal of Infrastructure Systems, Vol. 12, No. 1, pp. 18-32.10.1061/(ASCE)1076-0342(2006)12:1(18)Abdel Aziz, A. M. and Russell, A. D. (2006). “Generalized economic modeling for infrastructure and capital investment projects.” Journal of Infrastructure Systems, Vol. 12, No. 1, pp. 18-32.DOI
2 
Bang, M. G. (2014). A seminar celebrating PPP project introduction 20th anniversary, Ministry of Strategy and Finance, Available at: http://www. mosf.go.kr/main/main.jsp (Accessed: November 26, 2014).Bang, M. G. (2014). A seminar celebrating PPP project introduction 20th anniversary, Ministry of Strategy and Finance, Available at: http://www. mosf.go.kr/main/main.jsp (Accessed: November 26, 2014).Google Search
3 
Benito, B., Montesinos, V. and Bastida, F. (2008). “An example of creative accounting in public sector: The Private Financing of Infrastructures in Spain.” Critical Perspectives on Accounting, Vol. 19, No. 7, pp. 963-986.10.1016/j.cpa.2007.08.002Benito, B., Montesinos, V. and Bastida, F. (2008). “An example of creative accounting in public sector: The Private Financing of Infrastructures in Spain.” Critical Perspectives on Accounting, Vol. 19, No. 7, pp. 963-986.DOI
4 
Choi, L. G. (2005). Structual equation model, Trading Management Publication.Choi, L. G. (2005). Structual equation model, Trading Management Publication.Google Search
5 
Choi, S. J. (2014). The dynamic capabilities of construction companies to meet changing environments, Ph.D. Civil, University of Yonsei, Korea.Choi, S. J. (2014). The dynamic capabilities of construction companies to meet changing environments, Ph.D. Civil, University of Yonsei, Korea.Google Search
6 
Chun, J. K. (2007). “On establishment system model of economical efficiency for the BTL Project.” Journal of the Korean Society of Civil Engineers, Vol. 27, No. 5D, pp. 589-598.Chun, J. K. (2007). “On establishment system model of economical efficiency for the BTL Project.” Journal of the Korean Society of Civil Engineers, Vol. 27, No. 5D, pp. 589-598.Google Search
7 
Hayford, O. and Partner, C. U. (2006). “Successfully allocating risk and negotiating a PPP contract.” Proceedings of 6th Annual National Public Private Partnerships Summit, Sydney, Australia.Hayford, O. and Partner, C. U. (2006). “Successfully allocating risk and negotiating a PPP contract.” Proceedings of 6th Annual National Public Private Partnerships Summit, Sydney, Australia.Google Search
8 
Han, H. J., Choi, E. K. and Lee, C. S. (2004). “Development of the promoter selection procedural model for private participation in infrastructure projects.” Korean journal of construction engineering and management, Vol. 5, No. 3.Han, H. J., Choi, E. K. and Lee, C. S. (2004). “Development of the promoter selection procedural model for private participation in infrastructure projects.” Korean journal of construction engineering and management, Vol. 5, No. 3.Google Search
9 
Hwang, W. G. (2013). The new progress plan, CERIK, Available at: http://www.cerik.re.kr (Accessed: Novemver 26, 2014).Hwang, W. G. (2013). The new progress plan, CERIK, Available at: http://www.cerik.re.kr (Accessed: Novemver 26, 2014).Google Search
10 
Jooste, S. F., Levitt, R. E. and Scott, W. R. (2009). “Capacity, Legitimacy, and Interest: Toward a Framework for PPP Program Success.” In Lead 2009 Conference, South Lake Tahoe, CA.Jooste, S. F., Levitt, R. E. and Scott, W. R. (2009). “Capacity, Legitimacy, and Interest: Toward a Framework for PPP Program Success.” In Lead 2009 Conference, South Lake Tahoe, CA.Google Search
11 
Jung, J. M., Kim, S. Y. and Park, Y. Min. (2007). “Identification and effect analysis of risk factors for build transfer lease projects.” Korean journal of construction engineering and management, Vol. 8, No. 1.Jung, J. M., Kim, S. Y. and Park, Y. Min. (2007). “Identification and effect analysis of risk factors for build transfer lease projects.” Korean journal of construction engineering and management, Vol. 8, No. 1.Google Search
12 
Kim, B. I., Yun, S. M., Han, S. H. and Kim, H. H. (2008). “Appropriate roles of project participants for public partnership projects of railways through the organizational behavior theory.” Journal of the Korean Society of Civil Engineers, Vol. 28, No. 6D, pp. 839-847.Kim, B. I., Yun, S. M., Han, S. H. and Kim, H. H. (2008). “Appropriate roles of project participants for public partnership projects of railways through the organizational behavior theory.” Journal of the Korean Society of Civil Engineers, Vol. 28, No. 6D, pp. 839-847.Google Search
13 
Kim, D. Y., Han, S. H., Kim, H. and Park, H. (2009). “Structuring the prediction model of project performance for international construction projects: A Comparative Analysis.” Expert Systems with Applications, Vol. 36, No. 2, pp. 1961-1971.10.1016/j.eswa.2007.12.048Kim, D. Y., Han, S. H., Kim, H. and Park, H. (2009). “Structuring the prediction model of project performance for international construction projects: A Comparative Analysis.” Expert Systems with Applications, Vol. 36, No. 2, pp. 1961-1971.DOI
14 
Kim, D. I, Kang, D. S., Jin, Runzhi, and Hyun, C. T. (2012). “Efficiency of soft toll method (BTO+Shadow Toll) for public- private partnership projects.” Korea Research Institute for Human Settlement, Vol. 74, pp. 111-126.Kim, D. I, Kang, D. S., Jin, Runzhi, and Hyun, C. T. (2012). “Efficiency of soft toll method (BTO+Shadow Toll) for public- private partnership projects.” Korea Research Institute for Human Settlement, Vol. 74, pp. 111-126.Google Search
15 
Kline, R. B. (2005). Principles and practice of structural equation modeling (2nd ed.), New York: The Guilford Publications, Inc.Kline, R. B. (2005). Principles and practice of structural equation modeling (2nd ed.), New York: The Guilford Publications, Inc.Google Search
16 
Korea Development Institute (KDI) (2012). KDI economic outlook in the latter half (in Korean).Korea Development Institute (KDI) (2012). KDI economic outlook in the latter half (in Korean).Google Search
17 
Kumaraswamy, M. M. and Anvuur, A. M. (2008). “Selecting sus-tainable teams for PPP projects.” Building and Environment, Vol. 43, No. 6, pp. 999-1009.10.1016/j.buildenv.2007.02.001Kumaraswamy, M. M. and Anvuur, A. M. (2008). “Selecting sus-tainable teams for PPP projects.” Building and Environment, Vol. 43, No. 6, pp. 999-1009.DOI
18 
Kwak, S. N., Han, S. H., Soh, M. S., Jung, H. Y. and Jungm, W. Y. (2009). “Risk-integrated feasibility analysis model of BTL+BTO project.” The Journal of Architectural Institute of Korea, Vol. 25, No. 4, pp. 219-229.Kwak, S. N., Han, S. H., Soh, M. S., Jung, H. Y. and Jungm, W. Y. (2009). “Risk-integrated feasibility analysis model of BTL+BTO project.” The Journal of Architectural Institute of Korea, Vol. 25, No. 4, pp. 219-229.Google Search
19 
Lee, H. Y. (2008). Research methodology of professor’s Lee, Publication Chunglam (in Korean).Lee, H. Y. (2008). Research methodology of professor’s Lee, Publication Chunglam (in Korean).Google Search
20 
Lee, J. (2014). A study on the improvement of public benefit by financial re-structuralization of public private partnership project: Focusing on Minimum Cost Support (MCS), Ph.D, Dept of Real Estate Graduate School, University of Dong-Eui, Korea.Lee, J. (2014). A study on the improvement of public benefit by financial re-structuralization of public private partnership project: Focusing on Minimum Cost Support (MCS), Ph.D, Dept of Real Estate Graduate School, University of Dong-Eui, Korea.Google Search
21 
Lee, J. P. and Kang, D. J. (2013). “A Study on the model of choosing the appropriate private participation type in port.” The Asian Journal of Shipping and Logistics, Vol. 79, pp. 879-910.Lee, J. P. and Kang, D. J. (2013). “A Study on the model of choosing the appropriate private participation type in port.” The Asian Journal of Shipping and Logistics, Vol. 79, pp. 879-910.Google Search
22 
Lee, J. O., Hqng, T. J. and Kang, J. G. (2014). A study on application of minimum cost support for financial re-structuralization of act on private participation in infrastructure, Korea Public Land Laq Association, 65.Lee, J. O., Hqng, T. J. and Kang, J. G. (2014). A study on application of minimum cost support for financial re-structuralization of act on private participation in infrastructure, Korea Public Land Laq Association, 65.Google Search
23 
Lee, S. W. and Park, Y. S. (2013). Project activation and method search for PPP participation of small-medium contractor, Construction Issue Focus 2013-19, Construction & Economy Research Institute of Korea, Korea.Lee, S. W. and Park, Y. S. (2013). Project activation and method search for PPP participation of small-medium contractor, Construction Issue Focus 2013-19, Construction & Economy Research Institute of Korea, Korea.Google Search
24 
Ministry of Strategy and Finance (2006). The private investment Business manual (in Korean).Ministry of Strategy and Finance (2006). The private investment Business manual (in Korean).Google Search
25 
Ministry of Strategy and Finance (2013). 2013∼2017 national fiscal management plan (in Korean).Ministry of Strategy and Finance (2013). 2013∼2017 national fiscal management plan (in Korean).Google Search
26 
Ministry of Strategy and Finance (2013). The private investment law for infrastructure (in Korean).Ministry of Strategy and Finance (2013). The private investment law for infrastructure (in Korean).Google Search
27 
Ng, S., Wong, Y. M. and Wong, J. M. (2010). “A structural equation model of feasibility evaluation and project success for public–private partnerships in Hong Kong.” Engineering Management, IEEE Transactions on, Vol. 57, No. 2, pp. 310-322.10.1109/TEM.2009.2037142Ng, S., Wong, Y. M. and Wong, J. M. (2010). “A structural equation model of feasibility evaluation and project success for public–private partnerships in Hong Kong.” Engineering Management, IEEE Transactions on, Vol. 57, No. 2, pp. 310-322.DOI
28 
Park, Y. B. and Kim, D. C. (2013). Research on BTO program improvement ways through Seoul subway line 9, Korea Project Management Reaserch, Vol. 3, No. 1, pp. 55-78.Park, Y. B. and Kim, D. C. (2013). Research on BTO program improvement ways through Seoul subway line 9, Korea Project Management Reaserch, Vol. 3, No. 1, pp. 55-78.Google Search
29 
Park, Y. M., Kim, S. Y. and Kim, K. Y. (2004). “A study on the rate of return of private infrastructure investment project.” Korean Journal of Construction Engineering and Management, Vol. 5, No. 6, pp. 170-190.Park, Y. M., Kim, S. Y. and Kim, K. Y. (2004). “A study on the rate of return of private infrastructure investment project.” Korean Journal of Construction Engineering and Management, Vol. 5, No. 6, pp. 170-190.Google Search
30 
Public Construction Policy Committee (2013). “Institution improvement research for private fund diversification for infrastructure investment expansion.” Journal of the Korean Society of Civil Engineers.Public Construction Policy Committee (2013). “Institution improvement research for private fund diversification for infrastructure investment expansion.” Journal of the Korean Society of Civil Engineers.Google Search
31 
Shin, S. W. (2008). “BTO a study on the fair returns of private participants' investments on BTO PPI projects.” Korean Journal of Construction Engineering and Management, Vol. 10, No. 2.Shin, S. W. (2008). “BTO a study on the fair returns of private participants' investments on BTO PPI projects.” Korean Journal of Construction Engineering and Management, Vol. 10, No. 2.Google Search
32 
Sim, W. M. (2010). An analysis of the impact factors affecting the feasibility of BTL projects, Hanyang Graduate School of Engineering.Sim, W. M. (2010). An analysis of the impact factors affecting the feasibility of BTL projects, Hanyang Graduate School of Engineering.Google Search
33 
Sim, S. D., Choi, D. S., Choi, S. J. and Hang, L. S. et al. (2005). Risk evaluation and analysis research for private investment business of infrastructure, Korea Development Institue, Research report (2005-03) (in Korean).Sim, S. D., Choi, D. S., Choi, S. J. and Hang, L. S. et al. (2005). Risk evaluation and analysis research for private investment business of infrastructure, Korea Development Institue, Research report (2005-03) (in Korean).Google Search
34 
Smyth, H. and Edkins, A. (2007). “Relationship management in the management of PFI/PPP projects in the UK.” International Journal of Project Management, Vol. 25, No. 3, pp. 232-240.10.1016/j.ijproman.2006.08.003Smyth, H. and Edkins, A. (2007). “Relationship management in the management of PFI/PPP projects in the UK.” International Journal of Project Management, Vol. 25, No. 3, pp. 232-240.DOI
35 
Song, J. J. (2009). Statistics analysis mothods of SPSS & AMOS, 21th Publication.Song, J. J. (2009). Statistics analysis mothods of SPSS & AMOS, 21th Publication.Google Search
36 
Song, B. R. (2011). Private investment business condition and revitalization plan, Construction Economy, pp. 48-60.Song, B. R. (2011). Private investment business condition and revitalization plan, Construction Economy, pp. 48-60.Google Search
37 
Stewart, F. and Yermo, J. (2012). Infrastructure investment in new markets, OECP Publighing.Stewart, F. and Yermo, J. (2012). Infrastructure investment in new markets, OECP Publighing.Google Search
38 
Qi-ming, W. W. X. L. and Liang-feng, D. X. P. S. (2008). Critical influential factors for pricing in urban transportation infrastructure PPP project, Management Science.Qi-ming, W. W. X. L. and Liang-feng, D. X. P. S. (2008). Critical influential factors for pricing in urban transportation infrastructure PPP project, Management Science.Google Search
39 
World Economic Forum. (2013). The global competitiveness index 2013-2014.World Economic Forum. (2013). The global competitiveness index 2013-2014.Google Search
40 
Yu, Y. (2013). “Risk allocation policy establishment on SOC PPP project.” The Korean Association for Policy Studies, Vol. 22, No. 1, pp. 53-81.Yu, Y. (2013). “Risk allocation policy establishment on SOC PPP project.” The Korean Association for Policy Studies, Vol. 22, No. 1, pp. 53-81.Google Search
41 
Yun, S. M., Han, S. H. and Kim, D. Y. (2008). “Multi-objective genetic algorism model for determining an optimal capital structure of privately-financed infrastructure projects.” Journal of the Korean Society of Civil Engineers, Vol. 28, No. 1D, pp. 107-117.Yun, S. M., Han, S. H. and Kim, D. Y. (2008). “Multi-objective genetic algorism model for determining an optimal capital structure of privately-financed infrastructure projects.” Journal of the Korean Society of Civil Engineers, Vol. 28, No. 1D, pp. 107-117.Google Search
42 
Zhang, X. (2005). “Critical success factors for public–private partnerships in infrastructure development.” Journal of Construction Engineering and Management, Vol. 131, No. 1, pp. 3-14.10.1061/(ASCE)0733-9364(2005)131:1(3)Zhang, X. (2005). “Critical success factors for public–private partnerships in infrastructure development.” Journal of Construction Engineering and Management, Vol. 131, No. 1, pp. 3-14.DOI
43 
Zhang, X. (2005). “Criteria for selecting the private-sector partner in public–private partnerships.” Journal of Construction Engineering and Management, Vol. 131, No. 6, pp. 631-644.10.1061/(ASCE)0733-9364(2005)131:6(631)Zhang, X. (2005). “Criteria for selecting the private-sector partner in public–private partnerships.” Journal of Construction Engineering and Management, Vol. 131, No. 6, pp. 631-644.DOI
44 
Zou, P. X., Wang, S. and Fang, D. (2008). “A life-cycle risk management framework for PPP infrastructure projects.” Journal of Financial Management of Property and Construction, Vol. 13, No. 2, pp. 123-142.10.1108/13664380810898131Zou, P. X., Wang, S. and Fang, D. (2008). “A life-cycle risk management framework for PPP infrastructure projects.” Journal of Financial Management of Property and Construction, Vol. 13, No. 2, pp. 123-142.DOI