Austin, S., Baldwin, A., Li, B., and Waskett P. (2000) Analytical design planning
technique (ADePT): a dependency structure matrix tool to schedule the building design
process, Construction Management and Economics, Vol. 18, Issue 2. pp. 173-182.
Chen, C.H., Ling, S.F., and Chen, W. (2003) Project scheduling for collaborative product
development using DSM, International journal of project management, International
Journal of Project Management, Vol. 21, No. 4, pp. 291-299.
Daniel H.L., Troy A.D., Joel J.D., and Francis L. de los Reyes III (2001) System-Wide
Optimization of Wastewater Treatment Plants Using Genetic Algorithms, Proceedings
of the 2001 World Water and Environmental Resources Congress, held in Orlando, Florida,
May 20-24.
Fayez, M., Axelsson, P., Oloufa, A.A., and Hosni, Y. (2003) DSM vs CPM: Issues for
planning design & construction activities, ASCE, Proceedings of Construction Research
Congress 2003, New York, pp. 1-8.
Gebala, D. A., and Eppinger, S. D. (1991) Methods for analyzing design procedures,
the Proceedings of 3rd International ASME Conference on Design Theory and Methodology,
Sep. 22-25, 1991, Miami, FL., pp. 227-233.
Gu, B. H., Kim, T. H. (2007) Application System Improvement of the Codes and Standards
for Plant Design, Korean Journal of Construction Engineering and Management, Vol.
8, No 2, pp. 81-89.
Jang, S., Park, M., Lee, H. (2007) A Study on Schedule Management in Construction
Project Using the Dependency Structure Matrix, Proceeding of Korean Institute of Construction
Engineering and Management, pp. 682-686.
Kim, C. M., Park, Y. W. (2008) PBS Construction by Using DSM, Journal of the Korean
Society for Railway, Vol. 11, No.1, pp. 26-32.
Lee, S., Son, J., You, Y., Han, C., Development of Engineering Checklist Model for
Case-based Evaluation of Plant EPC Project, Korean Journal of Construction Engineering
and Management, Vol. 9, No. 3, pp. 146-152.
Park G. S. (2004) A study on development strategy for plant industry to achieve the
amount of order of 30 billion dollar, Korea Institute for Industrial Economics & Trade.
Park, M., Ham, Y., Lee, H., Kim, W., (2010) Development of Design Process Management
Model using Dependency Structure Matrix for Constructability, Korean Journal of Construction
Engineering and Management, Vol. 11, No. 5, pp. 65-74.
Mhaisalkar V., Bassin J., Paramasivam R., and Khanna P. (1993) Dynamic Programming
Optimization of Water‐Treatment‐Plant Design, J. Environ. Eng., Vol. 119, No. 6, pp.
1158-1175.
Lindemann U. Maurer U., Braun, T. (2009) Structural Complexity Management, Berlin,
Springer, 2009.
Son, J., Lee, S., Han, C., Kim, J., (2007) A Study on the Critical Success Factors
for Engineering Step on Plant Project, Korean Journal of Construction Engineering
and Management, Vol. 8, No. 6, pp. 227-234.
Warfield J. N. (1973) Binary matrices in system modeling, IEEE Transactions on Systems,
MAn, and Cybernetics, Vol. 3, No. 5, pp. 441-449.
Yassine, A. A., Falkenburg, D., Chelst, K. (1999) Engineering design management: an
information structure approach, International Journal of Production Research, Vol.
37, No. 13, pp. 2957-2975.