Woo, K.H., Lee, D.K., Lee, S.M., Lee, J.S. and Lee, C.H. (2009) A construction case
of cut-and-cover tunnel with precast arch bridge(PAB) system, Journal of the Korea
Concrete Institute, KCI, Vol. 21, No. 3, pp. 81-86.Woo, K.H., Lee, D.K., Lee, S.M.,
Lee, J.S. and Lee, C.H. (2009) A construction case of cut-and-cover tunnel with precast
arch bridge(PAB) system, Journal of the Korea Concrete Institute, KCI, Vol. 21, No.
3, pp. 81-86.
