Title Precast Concrete Copings for Precast Segmental PSC Bridge Columns : Ⅰ. Development and Verification of System
Authors 김태훈 ; 박세진 ; 김영진
Page pp.463-473
ISSN 10156348
Keywords performance;precast concrete copings;precast segmental PSC bridge columns;cast-in-place system;construction time;성능;조립식 코핑부;프리캐스트 세그먼트 PSC 교각;현장타설 코핑부;공사기간
Abstract The purpose of this study was to investigate the performance of precast concrete copings for precast segmental PSC bridge columns. The proposed system can reduce work at a construction site and makes construction periods shorter. The precast concrete copings provides an alternative to current cast-in-place systems, particularly for areas where reduced construction time is desired. A model of precast concrete copings was tested under quasistatic monotonic loading. As a result, proposed precast coping system was equal to existing cast-in-place system in terms of required performance. In the companion paper, the experimental and analytical study for the performance assessment of precast concrete copings for precast segmental PSC bridge columns is performed.