Mobile QR Code QR CODE : Journal of the Korean Society of Civil Engineers
Title Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work
Authors 김상범(Kim, Sang-Bum) ; 조지훈(Cho, Ji-Hoon)
DOI https://doi.org/10.12652/Ksce.2013.33.2.791
Page pp.791-800
ISSN 10156348
Keywords PSC 박스 거더교;개략공사비;대표공종 P.S.C Box Girder Bridge;Approximate Estimating;Breakdown of Standard Work
Abstract Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work