Title |
Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method |
Authors |
김상범(Kim, Sang-Bum) ; 조지훈(Cho, Ji-Hoon) |
DOI |
https://doi.org/10.12652/Ksce.2013.33.2.781 |
Keywords |
개략공사비;압출공법(ILM공법);대표공종;상관분석;다중회귀분석 Cost Estimation Model;Incremental Launching Method(ILM);Breakdown of Standard Work;Correlation Analysis;Multiple-Regression Analysis |
Abstract |
Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method |